Made of reinforced concrete, this new pier has its frontage parallel to the channel between Ing. White and Galván, especially designed for container and general cargo, it is 270 m long and 40 m wide, with an outlying mooring dolphin at 50 m eastbound, depth alongside 13,90 m at datum. One mobile 4th generation Gottwald 100 ton crane plus various reach stackers and forklifts for container operations; 360 reefer plugs at contiguous container yard. Will be provided with container gantry crane (post-Panamax) running on rail to be laid at pier.